At a glance
- There is no single state price: each city, town and village sets its own permit fees by local law or resolution.
- Most fees are based on the estimated construction cost or the square footage of the work.
- Board applications, consultant reviews and certificates are often charged separately from the permit itself.
- Starting work without a permit usually costs more: many towns add a penalty fee on top of the regular fee.
It is one of the first questions owners ask, and the honest answer is that it depends on where the property is. New York State makes each local government responsible for enforcing the building code, and each one adopts its own fee schedule to pay for that work. Two similar projects a few miles apart can carry quite different fees.
How permit fees are usually calculated
Most building departments use one of two methods, sometimes both:
- A fee based on the estimated construction cost. For example, the City of Middletown's code charges $10 for each $1,000 of construction cost up to $500,000, with a percentage-based inspection fee above that.
- A fee based on square footage, often with a minimum fee for small jobs.
- Flat fees for common small permits, such as demolition, fences, sheds or solar panels.
The permit fee normally covers plan review and the required construction inspections. Re-inspections after a failed inspection may be billed separately.
The other costs that come with an approval
- Certificate of occupancy or compliance fees. The Town of Newburgh, for example, lists a separate certificate of occupancy fee for new one- and two-family homes.
- Planning board and zoning board application fees, which are set separately from building permits.
- Consultant escrow: for site plans and subdivisions, many towns charge back the cost of their engineer, planner and attorney, and hold a deposit until the review is done.
- Professional fees for your own architect, engineer or surveyor, which are usually the largest cost on projects that need stamped drawings.
- Outside agencies, such as the county health department for wells and septic systems.
What happens if you build first
Work started without a permit usually has to be legalized later. Many towns add a penalty on top of the normal fee, and you may have to open walls or ceilings so the inspector can see the work. It is almost always cheaper to apply first.
How to budget before you apply
- Find the current fee schedule for your municipality. It is usually posted on the town website or in the town code.
- Have your designer give you a realistic construction cost, since that number often drives the fee.
- Ask whether your project will need a board approval, which is where escrow and consultant costs come in.
- Leave room for re-inspections and for certificate fees at the end.
Want a clear number before you start? In a free consultation we map every approval and fee your project will need.
Request a free consultationWritten by
Isaac Silberstein · Founder & Principal
Isaac founded Akrodic in Monroe, NY. He and the team prepare and file permit and board applications across Orange, Rockland, Westchester, Putnam, Dutchess, Ulster and Sullivan counties.
General information only, not legal advice. Requirements vary by municipality and change over time; confirm with your local building department.