- We check zoning and the existing certificate of occupancy before you commit to a lease.
- We coordinate the building permit with your architect, engineer and contractor.
- We handle change-of-use and change-of-occupancy questions, including partial changes.
- We follow through to the certificate of occupancy, so you can open on schedule.
For a business, every week between signing a lease and opening the doors is rent without revenue. Commercial build-outs are where approvals most often slip: a use that needs a special permit, a change of occupancy nobody flagged, or a final inspection booked too late. We plan the path before the work starts.
What we handle
- Tenant fit-outs for retail, office, medical and personal services
- Restaurants, cafes and food service
- Gyms, studios and assembly uses
- Changes of use and changes of occupancy, full or partial
- Sign permits and design review
- Certificates of occupancy, compliance and operating permits
Where we save the most time
- Before the lease: confirming the use is allowed and what the building will need for it
- During design: flagging code items that drive review comments, such as exits, fire separation and accessibility
- During review: answering comments in one complete response instead of several rounds
- At the end: lining up the final inspections and sign-offs in the right order
Related guides
Looking at a space? Send us the address and the use, and we'll tell you what it will take.