On this page
At a glance
- A change of use can need two separate approvals: zoning (is the new use allowed here?) and the building code (is the building safe for it?).
- New York requires a certificate of occupancy whenever a building, or any portion of it, is converted to a different use or occupancy classification.
- Many towns also require planning board site plan review for a commercial or industrial change of use, mainly for parking, traffic and loading.
- A partial change can be simpler, but the new space usually has to be separated from the rest of the building with fire-rated walls or floors.
It is one of the most common questions we get from owners and tenants of commercial and industrial buildings: the building is already there, so why does a new use need approvals at all? The short answer is that a change of use is regulated twice, once by local zoning and once by the New York State building code, and you need to clear both before the new use can open.
What counts as a change of use
Under the building code, every building is classified by how it is used, for example business (offices), mercantile (retail), assembly (restaurants, gyms, places of worship), factory, storage or educational. A change of occupancy happens when a space moves from one of these classifications to another, such as a warehouse becoming a gym or a store becoming a restaurant. It can also happen within the same classification, when the new use triggers different code requirements, for example a larger occupant load.
Zoning looks at use differently. Your town’s zoning code lists which uses are allowed in each district, so the question there is simply whether the new use is permitted where the building sits. A new tenant with the same kind of business usually isn’t a change of use for zoning, but a new kind of business often is.
Step 1: Zoning
- Permitted use: the building department can approve it, though many towns still require planning board site plan review for a commercial or industrial change of use.
- Special use permit: the use is allowed only if it meets extra conditions, and a board must approve it after a public hearing.
- Not allowed in the district: the only route is a use variance from the zoning board of appeals, which is hard to get, or a rezoning.
- Parking, loading and signs: a new use often needs more parking than the old one. If the site can’t provide it, you may need an area variance.
Step 2: The building code
Once zoning is settled, a building permit is needed for the change itself, even if little construction is planned. Since December 31, 2025, the 2025 Existing Building Code of New York State governs changes of occupancy in existing buildings. In general, a design professional reviews how the new use compares with the old one, and the bigger the jump in risk, the more of the building has to be brought up to current standards. Items that commonly come up are:
- Exits: number, width and travel distance for the new occupant load
- Fire sprinklers and fire alarms, which a new use may require even if the building never had them
- Accessibility, including an accessible entrance, route and restrooms
- Structure, when the new use brings heavier floor loads
- Plumbing fixture counts, ventilation and energy code requirements for the altered space
When the work is done and inspected, the building department issues a new certificate of occupancy for the new use. Opening before that certificate is issued is one of the most common reasons businesses get violations.
Partial vs. complete change of use
You don’t have to convert the whole building at once. A partial change of use, such as turning one bay of a warehouse into a showroom or adding offices to a factory, is common. The code looks at the converted portion and how it relates to the rest of the building. The usual options are to separate the new use from the existing one with fire-rated walls or floors, or to treat the building as mixed use and apply the stricter requirements more widely. Separation usually keeps the upgrades limited to the area that is changing, which is often the most economical route.
A complete change of use applies the review to the whole building, which can mean upgrading exits, fire protection and accessibility throughout. It is worth knowing early which path your project falls into, because it drives both cost and schedule.
Other approvals to plan for
- County health department approval for food service, and for well or septic systems if the new use increases flow
- Fire marshal review, and operating permits for some uses
- State environmental review (SEQRA), which the reviewing board completes
- County planning referral when the site is near a county or state road or a municipal boundary
How to avoid surprises
Before signing a lease or closing on a building, find out three things: whether the new use is allowed in the zoning district, what the current certificate of occupancy says, and whether there are any open permits or violations. A short feasibility review at that stage can show whether the project needs only a building permit, or also planning board, zoning board or health department approvals.
Featured projectSee a real change of use: one 40,000+ sq ft building, a cabinetry manufacturer and a youth gymnastics facilityPlanning a change of use for a commercial or industrial building? We can review the zoning and the code before you commit, prepare the applications and see the project through to the new certificate of occupancy.
Request a free consultationWritten by
Isaac Silberstein · Founder & Principal
Isaac founded Akrodic in Monroe, NY. He and the team prepare and file permit and board applications across Orange, Rockland, Westchester, Putnam, Dutchess, Ulster and Sullivan counties.
General information only, not legal advice. Requirements vary by municipality and change over time; confirm with your local building department.